Skip to content
RRR ElectricalElectricians, New York, NY
Answering 24/7 in New York, NY

Electrical panel upgrades for New York apartments and houses

A full panel, a 60-amp service, a board asking for a load letter, or a charger the panel can't carry. We calculate the load, size the new panel, file the permit and get it inspected.

Load calculation first
DOB permit filed
New York, NY
New 200-amp panel being wired in a New York City co-op

RRR Electrical · job sheet

Job
Electrical Panel Upgrade
Section
Panels & Service
Location
New York, NY
Line
Answered 24/7
(347) 352-8192
Quick answer

A panel upgrade in a New York City usually means moving from a 60 or 100-amp service to 200 amps, or replacing a full or obsolete panel with a new one with room to grow. Angi's New York data puts 200-amp service installation at roughly $1,465 to $2,250, and the job needs a DOB electrical permit and inspection.

Updated September 2026

The panel is where everything you plug in meets the service the building gives you. When both date from the 1960s and the apartment now runs an induction range, a heat pump and two window units, breakers trip and lights sag. The fix is a load calculation first, then a panel sized to the load.

In a house the upgrade is mostly ours to do. In a co-op or condo it's a three-way job: you, the building, and sometimes Con Edison, because a bigger panel is useless if the riser feeding it is undersized. We check the riser and the meter before quoting, so the number you get is for the whole path.

We install Square D and Eaton panels and hand you a labeled directory and the inspection sign-off.

Electrician tracing a fault at an older breaker panel in New York, NY

Same-size swap or a service upgrade?

OptionWhen it fitsWhat's involved
Same-amperage panel swapObsolete or full panel, service already adequateNew panel and breakers, same feeder, DOB permit
100A to 200A upgradeCharger, heat pump or range being added; load calculation over 100ANew panel, main and service conductor; Con Edison may pull the meter
Panel plus subpanelLong runs to a kitchen or basement, main panel fullMain panel kept or replaced, feeder to a new subpanel

100-amp to 200-amp upgrades

Going from 100 to 200 amps means a new panel, a new main breaker, and often a larger service conductor from the meter. In a one- or two-family house the conductor run is short and the job is usually a day. In an apartment building the feeder from the meter room can be long and shared, so we check its size before promising 200 amps; sometimes the honest answer is 150. The permit is filed in DOB NOW, Con Edison is scheduled if the service has to be pulled, and inspection follows.

Planning range: 100A to 200A upgrade all-in incl. DOB permit and Con Edison coordination

$1,500 to $4,000 all-in; older buildings needing a service entrance upgrade $3,500 to $6,000. Source: aecontractorsnyc.com, 2026-09. Published market range for budgeting only, not our quote.

Load calculation for new equipment

A load calculation adds up what the space actually draws: lighting and general receptacles by square footage, the kitchen circuits, fixed appliances, HVAC, and any charger or heat pump you're planning. The number tells you whether the existing service can carry the new load or whether the panel is only half the answer. Co-op and condo boards ask for this as a load letter before they approve an alteration, and we prepare it as part of the estimate rather than as a separate visit.

Panel relocation

Panels in closets, bathrooms and behind refrigerators fail code and inspection. Moving one means extending every branch circuit to the new location, which in plaster-and-lath walls is careful work. We plan the route with the fewest openings, use armored cable throughout, patch as we go, and rebuild the wall only where we had to open it. Relocation adds labor to a straightforward upgrade, so we'll tell you when the existing spot can stay and when the inspector won't sign off on it.

Federal Pacific and Zinsco panel replacement

Federal Pacific Stab-Lok and Zinsco panels have a documented history of breakers that fail to trip under fault. If your panel carries either name, replacement is the recommendation regardless of how it's behaving today. The swap is a like-for-like amperage change with new breakers, new bus and new grounding, and it's a good moment to add AFCI and GFCI protection where the 2025 code now requires it. Insurers and co-op boards increasingly ask for this before approving renovations, and the panel label tells you which brand you have.

Load calculation worksheet on a panel in a New York apartment

What moves the price

  • Amperage: a 200-amp service costs more than a same-size panel swap
  • Length and size of the service conductor from the meter
  • Whether Con Edison has to disconnect or upgrade the service
  • Panel brand, breaker count and AFCI or GFCI breakers required
  • Relocation, with branch circuits extended to the new spot
  • Plaster, lath and finished-wall repair
  • DOB filing and inspection fees
Planning range: 200-amp panel upgrade, NYC

$1,465 to $2,250 to install 200-amp service; average panel upgrade $1,802, most paying $1,351 to $2,252. Source: www.angi.com, 2026-07-09. Published market range for budgeting only, not our quote.

What a panel upgrade includes

  • Load calculation and load letter for the building
  • Permit filed in DOB NOW before work starts
  • New panel with copper bus and full-size spaces
  • New main breaker sized to the service
  • Every branch circuit landed and torqued to spec
  • AFCI and GFCI breakers where the 2025 code requires them
  • Grounding and bonding brought to current code
  • Typed circuit directory on the panel door
  • DOB inspection scheduled and attended
Old panel next to its new 200-amp replacement in a New York City basement

What we see in New York buildings

In Manhattan nearly all housing units, about 97 percent, sit in buildings of six or more units, so a panel upgrade there is rarely just a panel. The feeder from the meter room, the building's riser capacity and the alteration agreement all come into it, and a load letter is usually the first thing the board wants. A hardwired Level 2 charger is the most common reason people call: it needs a 240V circuit with spare capacity, and many apartments need the panel upgrade before the charger can go in.

What happens after you call

  1. 1

    Load calculation and site check

    We add up the real load and look at the riser, meter and existing panel before quoting.

  2. 2

    Written scope

    Amperage, panel model, breaker schedule and whether Con Edison is involved, in writing.

  3. 3

    Permit filed

    The electrical permit goes into DOB NOW before the old panel comes off the wall.

  4. 4

    Panel installed

    Power off, new panel and main set, every circuit landed, labeled and tested.

  5. 5

    Inspection and sign-off

    We meet the DOB inspector and hand you the sign-off and the circuit directory.

Brands we install and service include Square D and Eaton panels, Leviton and Lutron devices, and Tesla and ChargePoint chargers.

Questions about electrical panel upgrade in New York

Guides on this topic

Talk to an electrician

Need electrical panel upgrade in New York, NY?

We answer around the clock, diagnose at the panel, and file the permit before the work starts.

RRR Electrical · service line

Hours
24 hours, 7 days
Coverage
All five boroughs
Emergencies
Dispatched at any hour
(347) 352-8192

Call or find us

One number, answered 24/7

RRR Electrical · contact

Hours
Open 24 hours, 7 days a week
Office
39 Fulton St, New York, NY 10038
Coverage
Manhattan, Brooklyn, Queens, the Bronx and Staten Island. See local areas

Map of 39 Fulton St, New York, NY 10038

Call (347) 352-8192